§ 8713 Levee Modification Approval
A farmer owns a levee next to a river that often floods. He wants to make the levee taller to protect his crops.
The farmer must first draw up his plans for making the levee taller and show them to the board. If the board says okay, they will watch while the farmer does the work to make sure it’s done right.
AI-generated — May contain errors. Not legal advice. Always verify source.
§ 8713 Levee Modification Approval
Last verified: January 23, 2026